Maximum tariff rates to be charged in the Port of Barcelona's following franchises:
TERMINAL DE CONTENIDORS DE BARCELONA SL (TCB) on the south wharf;
TERMINAL CATALUNYA SA (TERCAT) on the Princep d'Espanya and Prat Wharfs, and
TERMINAL PORT NOU SA on the Adossat South Wharf.
A:
In respect of the TCB:
To approve the modification of maximum tariffs to be charged in the Container Terminal on the South
Wharf with terms as follows:
a) Effective as of 1 October 2007 and until 31 December 2009, the tariffs on horizontal port
transport services from railway to any point in the terminal or vice versa, and/or for transfers
from railway to lorry or vice versa, are changed to the following rates:
- Full Containers <(=)32'....................................................................20 euros/container
- Empty Containers <(=) 32' .................................................................15 euros/container
- Full Containers > 32' ......................................................................25 euros/container.
- Empty Containers > 32' .....................................................................20 euros/container.
b)
variable rate in function of time in storage
Time in storage euros/ TEU and day
First 7 days...........................0.00
From 8th to 14th day................... 5.00
From 15th to 21st day.................. 10.00
From 22nd to 28th day ...................15.00
From 29th to 42nd day ...................20.00
More than 42 days....................... 40.00
B: In respect of TERCAT:
To approve the modification of maximum tariffs to be charged in the multipurpose terminal on the
Princep d'Espanya Wharf and the container terminal on the Prat Wharf with terms as follows:
a) Effective as of 1 October 2007 and until 31 December 2009, the tariffs on horizontal port
transport services from railway to any point in the terminal or vice versa, and/or on transfers
from railway to truck or vice versa, are changed to the following rates:
- Full Containers <(=)32'......................................................................20 euros/container
- Empty Containers <(=)32' ....................................................................15 euros/container
- Full Containers > 32' .......................................................................25 euros/container.
- Empty Containers > 32' ......................................................................20 euros/container.
b)
variable rate in function of time in storage
Time in storage euros/ TEU and day
First 7 days 0.00
From 8th to 14th day........................... 5.00
From 15th to 21st day ...........................10.00
From 22nd to 28th day........................... 15.00
From 29th to 42nd day........................... 20.00
More than 42 days........................... 40.00
During the last week of January of every year, the service provider shall provide the Port
Authority of Barcelona a report of the additional amount obtained during the preceding year
due to the present modification of tariffs on full container storage.
c) In respect of TERMINAL PORT NOU
To approve the modification of maximum tariffs to be charged in the multipurpose terminal on the
Adossat South Wharf of the Port of Barcelona with terms as follows:
Effective as of 1 October 2007 and until 31 December 2009, and provided that the service provider
sends information on the container terminal's entries/departures by land to the Port Authority of
Barcelona telematically, the tariff on port storage services for full containers with Barcelona as
origin/destination are changed to the amount obtained by adding together the following
components:
1/ b.1/ variable rate in function of time in storage
Time in storage Euros/ TEU and day
First 7 days..................................0.00
From 8th to 14th day........................... 5.00
From 15th to 21st day........................... 10.00
From 22nd to 28th day........................... 15.00
From 29th to 42nd day........................... 20.00
More than 42 days........................... 40.00
2/ b.2/ additional fixed rate
Time in storage euros/TEU
First 7 days................................... 0.00
More than 7 days...................................20.00
During the last week of January of every year, the service provider shall provide the Port
Authority of Barcelona a report of the additional amount obtained during the preceding year
due to the present modification of tariffs on full container storage.
This transcript reflects the draft of the meeting's minutes and is subject to the terms resulting from their
approval in the next meeting, having informed the board that any correction made shall be
communicated.
This is all communicated in compliance with that laid down in Article 58 of Act 30/1992 of 26 November.
Napoli worldport | Italy |
---|---|
Genoa worldport | Italy |
Ashdod worldport | Isreal |
Thessaloniki wor | Greece |
Takoradi worldpo | Ghana |
Tema worldport | Ghana |
Hamburg worldpor | Germany |
Kotka worldport | Finland |
Said worldport | Egypt |
Sokhna worldport | Egypt |
>>More |