A: Tonnage due
• ro-ro vessels (GT up to 10 000) 0.40 EUR/GT unit
• ro-ro vessels (GT over 10 000) 0.30 EUR/GT unit
• other vessels (GT up to 20 000) 0.55 EUR/GT unit
• other vessels (GT over 20 000) 0.50 EUR/GT unit
Deductions from tonnage due
Deductions from tonnage due shall be applied to ro-ro lines starting from the 1st call for each calendar year separately:
• 1 call per week 15%
• 2 calls per week 30%
• 3 and more calls per week 50%
For container vessels on regular lines deductions from tonnage dues are valid for every calendar year separately:
• 1. - 20. call 20%
• 21-40. call 30%
• starting from 41. call 55%
• 3 or more calls per week 70%
Reefer vessels with reefer cargo get a discount of up to 50% from tonnage dues.
B: Waste fee
Waste fee is levied based on vessel gross tonnage (GT) for each vessel call separately
in accordance with the following rate:
• All vessels 0.05 EUR/GT unit
C: Mooring charge
Mooring charge is levied for each mooring operation separately in the following cases:
• at the entrance of the vessel into the port;
• at the leaving of the vessel from the port;
• at the re-mooring of the vessel at the request of the captain and/or agent of the vessel and due to reasons not related to loading-discharging operations and not proceeding from weather conditions;
• at the re-mooring of the vessel, if this is related to loading-discharging operations by different operators within the limits of one harbour.
Mooring charge is levied according to the gross tonnage of the vessel (GT) separately for every mooring operation according to the following rates of mooring charges:
GT interval Rates of mooring charges for one mooring operation (EUR)
0 – 2 000 70
2 001 – 6 000 120
6 001 – 20 000 150
20 001 – 50 000 200
over 50 000 250
A single mooring operation is considered mooring, unmooring or hauling (less than 100 m). Re-mooring a vessel from one berth to another is considered two mooring operations. Shifting the vessel to the road with a later mooring to a quay and turning,
is considered re-mooring.
Bunkering vessels and military vessels are exempted form mooring charge, if mooring is performed by the vessel and port owner has not requested the providing of the mooring operation by the port owner.
D:Electricity supply and water supply charges
Plugging the vessel into the electricity system on shore and use of electricity supply –
according to the tariff established by the service provider.
The amount equal to 10-fold fee, calculated on the basis of regular rates applicable in the port, is charged for unauthorized interconnecting to the electricity supply networks.
ater supply through quay systems − according to the tariff established by the service provider.
E:Fee for the use of port’s auxiliary vessels
Liquidation of oil pollution 122 EUR/ hour + fee for short-term use of the vessel
Napoli worldport | Italy |
---|---|
Genoa worldport | Italy |
Ashdod worldport | Isreal |
Thessaloniki wor | Greece |
Takoradi worldpo | Ghana |
Tema worldport | Ghana |
Hamburg worldpor | Germany |
Kotka worldport | Finland |
Said worldport | Egypt |
Sokhna worldport | Egypt |
>>More |